The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.
The installation sequence of the steel workshop building is:
First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.