
Add to Cart
1. The steel structure warehouse is quickly assembled. The construction of normal buildings will take at least a few months. The steel structure warehouse is very fast and easy to install. All drilling, cutting and welding are carried out on the production site. Then send the components to the construction site for assembly. In addition to the short const
2. The steel structure warehouse is composed of the main frame, which is connected by H-shaped beams, supports, walls and roof Pur bars, roof and walls, and uses various panels that overlap with other components (such as doors and windows) for connection. The steel structure workshop has the advantages of large span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good insulation effect, long service life, space saving, and good seismic performance. Flexible layout, etc.
Dimension | Length x Width x Eave height/ Ridge height |
Frame type | Portal frame, multi-story frame |
Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation |
Accessory | Ridge tile, trim, Gutter, Down pipe,skylight, clerestory |
Door | Sliding door, Roll up door, industrial section door, swing door |
Window | PVC window, aluminum window, metal louver |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products,to meet the needs of the various types of steel structure engineering.