
Add to Cart
The material of the steel structure project is the main factor that directly affects the price. The main body of the workshop is a steel structure frame, which accounts for about 70%-80% of the total cost of the steel structure project. The market price fluctuations of steel structure raw materials directly affect the cost of steel structure projects. There are also large differences in the material prices of section steel and the price of load-bearing surfaces, as well as the material and thickness of hoarding. The life of steel structure is the main factor affecting the cost of steel structure engineering.
tem | Specification |
Size | 5800*2400*2896mm(13.92m2) |
Steel Structure | Prefab steel structure |
Wall Panel | 0.326/0.376/0.426/0.476mm THC steel sheet |
50/75/100mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Wall Color | White grey and more(Depending on quantity) |
Roof | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Door | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel with lock | |
Window | Aluminum PVC sliding door with security bar |
Floor | MGO / cement fiber floor board |
Forklift pockets are designed in bottom frame for easy moving. Four container corners ensure cabin can be locked with shipping container during sea transportation.