
Add to Cart
1. The steel structure warehouse is quickly assembled. The construction of normal buildings will take at least a few months. The steel structure warehouse is very fast and easy to install. All drilling, cutting and welding are carried out on the production site. Then send the components to the construction site for assembly. In addition to the short const
2. The steel structure warehouse is composed of the main frame, which is connected by H-shaped beams, supports, walls and roof Pur bars, roof and walls, and uses various panels that overlap with other components (such as doors and windows) for connection. The steel structure workshop has the advantages of large span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good insulation effect, long service life, space saving, and good seismic performance. Flexible layout, etc.
tem | Specification |
Size | 5800*2400*2896mm(13.92m2) |
Steel Structure | Prefab steel structure |
Wall Panel | 0.326/0.376/0.426/0.476mm THC steel sheet |
50/75/100mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Wall Color | White grey and more(Depending on quantity) |
Roof | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Door | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel with lock | |
Window | Aluminum PVC sliding door with security bar |
Floor | MGO / cement fiber floor board |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products, to meet the needs of the various types of steel structure engineering.